Utility-Grade Power.

Hyperscale-Ready Infrastructure.

Where power infrastructure meets digital intelligence — enabling the future of AI, data centers, and blockchain at scale.

Book a Briefing
Explore the Facility

Inland, Hurricane-Resilient

Tier III+ Readiness

Company Overview


Florida remains underserved in large-scale, mission-critical digital infrastructure. While Miami, Tampa, and Orlando host enterprise and colocation facilities, none are designed for true hyperscale demand. DCIP Group fills this gap with a unique asset: the only site in Florida expandable to 1 GW of onsite power capacity, directly connected to the Florida Gas Transmission pipeline and supported by 500 acres of expansion land.

Tier III design with N+1 redundancy.

Gateway reach via Miami subsea cables.

Direct FGT pipeline interconnect.

Inland siting + stormwater systems.

Competitive Edge


SNAPSHOT

LOCATION Arcadia, Florida

CORE SITE Former 340 MW natural gas plant

PHASE 1 1.5 MW on FP&L

PHASE 2 80 MW Tier III campus

BUILD PLAN +40 MW/quarter → 480 MW

FUTURE Up to 1 GW (LM6000)

  • Onsite generation integrated with Tier III data center design and N+1 redundancy.

  • Purpose-built power and cooling profile for AI/ML clusters and mission-critical workloads.

  • Positioned in the Miami–Tampa–Orlando triangle with gateway reach to Latin America.

  • Only Florida site designed to scale to 1 gigawatt across a 500-acre campus.

Upcoming Events


Infrastructure Summit 2025

October 15-16, 2025

Venue
Wynn Las Vegas | Las Vegas, Nevada

DCIP Group is honored to participate the Infrastructure Summit, joining industry leaders advancing the future of energy and digital infrastructure.

Learn More

Let’s work together.

At DCIP Group, we’re pioneering the future of AI-ready power and data infrastructure in Florida. Whether you’re an investor, technology partner, or potential client, we’d love to hear from you.
Complete the form and our development team will respond within one business day.