Utility-Grade Power.
Hyperscale-Ready Infrastructure.
Where power infrastructure meets digital intelligence — enabling the future of AI, data centers, and blockchain at scale.
Inland, Hurricane-Resilient
Tier III+ Readiness
Company Overview
Florida remains underserved in large-scale, mission-critical digital infrastructure. While Miami, Tampa, and Orlando host enterprise and colocation facilities, none are designed for true hyperscale demand. DCIP Group fills this gap with a unique asset: the only site in Florida expandable to 1 GW of onsite power capacity, directly connected to the Florida Gas Transmission pipeline and supported by 500 acres of expansion land.
Tier III design with N+1 redundancy.
Gateway reach via Miami subsea cables.
Direct FGT pipeline interconnect.
Inland siting + stormwater systems.
Competitive Edge
SNAPSHOT
▸ LOCATION Arcadia, Florida
▸ CORE SITE Former 340 MW natural gas plant
▸ PHASE 1 1.5 MW on FP&L
▸ PHASE 2 80 MW Tier III campus
▸ BUILD PLAN +40 MW/quarter → 480 MW
▸ FUTURE Up to 1 GW (LM6000)
-
Onsite generation integrated with Tier III data center design and N+1 redundancy.
-
Purpose-built power and cooling profile for AI/ML clusters and mission-critical workloads.
-
Positioned in the Miami–Tampa–Orlando triangle with gateway reach to Latin America.
-
Only Florida site designed to scale to 1 gigawatt across a 500-acre campus.
Upcoming Events
Infrastructure Summit 2025
October 15-16, 2025
Venue
Wynn Las Vegas | Las Vegas, Nevada
DCIP Group is honored to participate the Infrastructure Summit, joining industry leaders advancing the future of energy and digital infrastructure.
Let’s work together.
At DCIP Group, we’re pioneering the future of AI-ready power and data infrastructure in Florida. Whether you’re an investor, technology partner, or potential client, we’d love to hear from you.
Complete the form and our development team will respond within one business day.